Assembly

Professional & on schedule

Assembly

Professional
& on schedule

Together at last

In the penultimate manufacturing step of our production process, everything comes together. All parts are assembled before they undergo a final quality inspection. Our qualified employees guarantee the highest quality during assembly. Thanks to our virtually barrier-free crane and handling systems, we are able to move both small and large components effortlessly between the production and assembly halls. In addition, a large number of slewing cranes within our assembly halls enable a flexible and cost-efficient material flow.

Everything from one source

Through the continuous qualification and certification of our employees as well as our processes, we are able to maintain the highest quality standards. In addition, our proven processes ensure a cost-effective and efficient material flow.

Due to our possibilities of internal measurement of the finished components, your project can be realized from production to assembly to testing and delivery from a single source.

Your advantages at a glance

Barrier free
crane system

External assembly
on request

Qualified &
certified employees

Short
delivery times

Highest
quality

Barrier free
crane system

External assembly
on request

Qualified &
certified employees

Short
delivery times

Highest
quality

Our further competencies

We are here for you!

Do you have questions about our services or need assistance? We are happy to support you personally. 

We are looking forward to your message.

Copyright 2020@ All Rights Reserved. Design By Mayer Holding

Upgrading energy efficiency at Mayer Ipari és Kereskedelmi Bt.

Project ID: GINOP-4.1.4-19-2019-00332

Beneficiary’s name: “Mayer Ipari és Kereskedelmi” Betéti Társaság

Subsidy amount: 37 354 879 HUF

Subsidy rate: 55 %

Project description: 

As part of SolaA development, a solar system will be installed on the building of production of the Kisfalud headquarters of the company. The implementation of the investment is carried out during the period of 1/5/2020 and 30/4/2022.

A solar system with a capacity of 251,6 KWP will be installed in the course of the project. The system consists of 3 inverters type Huawei SUN2000-50KTL, 1 inverter type Huawei SUN2000-60KTL and 553 pieces of monocrystalline solar cell modules type Longi 455. Aerofix support system will ensure fixing of the solar panels on the flat roof. The system also includes properly sized Ac and DC control cabinets, solar cabling, and solar connectors.

Project completion: July 30, 2022