Competencies

Benefit from our vertical range of manufacture

We are your partner
-
from the drawing to the final product

As a Mayer customer, you benefit from our high vertical range of manufacture and a consistently high standard of quality throughout all processing steps. Our long-standing customers appreciate the short delivery times, our adherence to delivery dates and our high flexibility. We handle every project for you with maximum customer orientation. Convince yourself of the efficiency of our specialized staff, which is equipped with the latest machines.

Consulting

Laser Cutting


Deburring


Press Braking

Thin Sheet
Metal Welding

Powder
Coating

Assembly


Quality Management

Consulting

Laser Cutting


Deburring



Press Braking

Thin Sheet
Metal Welding

Powder
Coating

Assembly


Quality Management

Consulting



Laser
Cutting



Deburring




Press Braking


Thin Sheet
Metal Welding


Powder
Coating


Assembly



Quality
Management


We are here for you!

Do you have questions about our services or need assistance? We are happy to support you personally. 

We are looking forward to your message.

Copyright 2020@ All Rights Reserved. Design By Mayer Holding

Upgrading energy efficiency at Mayer Ipari és Kereskedelmi Bt.

Project ID: GINOP-4.1.4-19-2019-00332

Beneficiary’s name: “Mayer Ipari és Kereskedelmi” Betéti Társaság

Subsidy amount: 37 354 879 HUF

Subsidy rate: 55 %

Project description: 

As part of SolaA development, a solar system will be installed on the building of production of the Kisfalud headquarters of the company. The implementation of the investment is carried out during the period of 1/5/2020 and 30/4/2022.

A solar system with a capacity of 251,6 KWP will be installed in the course of the project. The system consists of 3 inverters type Huawei SUN2000-50KTL, 1 inverter type Huawei SUN2000-60KTL and 553 pieces of monocrystalline solar cell modules type Longi 455. Aerofix support system will ensure fixing of the solar panels on the flat roof. The system also includes properly sized Ac and DC control cabinets, solar cabling, and solar connectors.

Project completion: July 30, 2022